Completion time: 3 month
Works included: Entire renovation
It seemed to take forever to peel back the old paint on the doors and prep them for re-painting. And there were so many doors. The end result, I believe, speaks for itself. The flooring was delightful, especially as the heating was under the floor – a real treat on those cold winter days. The amazing 3.8 m ceilings lent this already spacious property an extra element of luxury.
powered by 

What's Nearby?
Education
- İstanbul Cooking School (0.14 km)2 reviews
Hospitals
- Alpha Tıp Merkezi (0.38 km)1 reviews
Bank
Grocery
- CarrefourSA Gurme (0.46 km)2 reviews
Stores
- Paşalar (0.21 km)3 reviews